VSD Drive Cabinets

Category
Case Study
About This Project

Client: Ampcontrol Mackay
Start: 6/1/2014
Finished: 15/2/2014

Design and Construct 2 x 33 Kilowatt Actron package systems with fault bypass loop and fully welded stainless steel ducting.

Call us on 1300 AAAHVAC to arrange your free building HVAC audit and report