Whitsunday Community Health Centre
Client: BEMS Mackay Start: 18/08/2014 Finished: 12/9/2014 Replace existing air conditioning systems....
Client: BEMS Mackay Start: 18/08/2014 Finished: 12/9/2014 Replace existing air conditioning systems....
Client: Aurizon Start: 30/7/2014 Finished: 30/08/2014 Replace the existing chiller with a Hitachi 150 Kilowatt air cooled chiller....
Client: DJAG Start: 6/6/2014 Finished: 30/8/2014 Responsible for the supervision and quality auditing of appointed duct cleaning contractors....
Client: BEMS Northwest region Start: 14/6/2014 Finished: 30/6/2014 Provide HVAC Hygiene and air sampling for 2 floors with 4 packaged units....
Client: BHP Billiton Mitsubishi Alliance Start: 3/3/2014 Finished: 11/4/2014 Design and Construct new indoor ventilation system and Install new Actron Package Unit...
Client: Ampcontrol Mackay Start: 6/1/2014 Finished: 15/2/2014 Design and Construct 2 x 33 Kilowatt Actron package systems with fault bypass loop and fully welded stainless steel ducting....
Client: Tenix in Cannonvale Start: 31/5/2013 Finished: 15/12/2013 Design and Construct ventilation systems for Blower room....
Client: BHP Billiton Mitsubishi Alliance Start: 6/8/2012 Finished: 25/9/2013 Overhaul cabin and P.C.R. Airconditioning Units and replace major components....
Client: BHP Billiton Mitsubishi Alliance Start: 22/5/2012 Finished: 16/7/2012 Overhaul cabin and P.C.R. Airconditioning Units and replace major components....
Client: BHP Billiton Mitsubishi Alliance Start: 14/8/2011 Finished: 25/9/2011 Replace all existing ductwork within and below the M.C.C and install new Actron Packaged unit and stainless steel ducting. Including Civil, Plumbing & building...
Client: BHP Billiton Mitsubishi Alliance Start: 1/5/2011 Finished: 30/6/2011 Overhaul cabin and P.C.R. Airconditioning Units and replace major components....
Client: BHP Billiton Mitsubishi Alliance Start: 12/2/2011 Finished: 16/4/2011 Overhaul cabin and P.C.R. Airconditioning Units and replace major components....