Archive

Client: BHP Billiton Mitsubishi Alliance Start: Oct-2013 Finished: Apr-2016 Ongoing monthly maintenance of all Airconditioning systems and HVAC Hygiene through the wash plant area....

Client: Building and Asset services Start: Dec-2015 Finished: Dec-2015 Design and Construct replacement of HVAC systems totaling 300 kilowatts for Longreach School of Distance Education. ...

Client: Mackay Regional Council Start: 14/12/2015 Finished: 2/02/2016 Replace 11 x air handling units varying in size from 16 to 120 Kilowatt, new chilled water and condenser water loop pumps and cooling tower...

Client: Anglo American Start: Nov-2014 Finished: Jan-2015 Design and install ducting in a modular format to allow future transformer change outs for the Washplant MCC....

Client: Aurizon Start: 30/7/2014 Finished: 30/08/2014 Replace the existing chiller with a Hitachi 150 Kilowatt air cooled chiller....

Client: DJAG Start: 6/6/2014 Finished: 30/8/2014 Responsible for the supervision and quality auditing of appointed duct cleaning contractors....

Client: BEMS Northwest region Start: 14/6/2014 Finished: 30/6/2014 Provide HVAC Hygiene and air sampling for 2 floors with 4 packaged units....

Client: BHP Billiton Mitsubishi Alliance Start: 3/3/2014 Finished: 11/4/2014 Design and Construct new indoor ventilation system and Install new Actron Package Unit...

Client: Ampcontrol Mackay Start: 6/1/2014 Finished: 15/2/2014 Design and Construct 2 x 33 Kilowatt Actron package systems with fault bypass loop and fully welded stainless steel ducting....

Client: Tenix in Cannonvale Start: 31/5/2013 Finished: 15/12/2013 Design and Construct ventilation systems for Blower room....

Client: BHP Billiton Mitsubishi Alliance Start: 6/8/2012 Finished: 25/9/2013 Overhaul cabin and P.C.R. Airconditioning Units and replace major components....

Call us on 1300 AAAHVAC to arrange your free building HVAC audit and report