Goonyella Wash plant Main M.C.C (Sub 03)

Category
Case Study
About This Project

Client: BHP Billiton Mitsubishi Alliance
Start: 28/03/2006
Finished: 30/06/2006

Design & Construct a 40 KW A.P.A.C packaged unit and an 85 KWA.P.A.C remote air cooled packaged unit with 1.2mm stainless steel ducting. Re-locate existing Temperzone airconditioning.

Call us on 1300 AAAHVAC to arrange your free building HVAC audit and report